{"page":{"id":442,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://ghouly.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-17\">17 November 2026</time></p>\n<p>Ordered the crewneck in Sage and now you want it in Charcoal? Typed &#8220;SPOOKY NANA&#8221; when the card says Auntie? Realised the treat bag is heading to your old apartment? This page explains how to cancel a Ghouly order or change its size, colour, personalisation spelling or shipping address, how long you have to do it and how refunds for cancelled orders work. The short version: email us within <strong>24 hours of ordering</strong>, and refunds for cancelled orders are sent within <strong>7 days</strong>.</p>\n<section class=\"policy-summary\">\n<h2>Cancelling or changing at a glance</h2>\n<ul>\n<li><strong>Window:</strong> 24 hours from the moment you placed your order.</li>\n<li><strong>How:</strong> by email to support@ghouly.shop. There is no cancel button on the site.</li>\n<li><strong>What you can change:</strong> size, colour, personalisation spelling and shipping address.</li>\n<li><strong>Refunds for cancelled orders:</strong> sent within 7 days.</li>\n<li><strong>Missed the window:</strong> every product can still be returned within 60 days of delivery, with a free return label.</li>\n<li><strong>Our replies:</strong> within 24 hours on business days, Monday to Friday.</li>\n</ul>\n</section>\n<h2>1. Why there is a 24-hour window</h2>\n<p>Ghouly designs are printed after you order, and processing takes 1–3 business days. Once your shirt, mug or blanket has been printed with your chosen size, colour or name, that particular item exists only in that form. The 24-hour window gives you a calm stretch of time to reread your confirmation email, check the spelling of every child&#8217;s name on a Spooky Mama crewneck and make sure the delivery address is right, before production moves on.</p>\n<p>The window is measured from the time your order was placed, as shown in your order confirmation email. It runs for 24 hours in a row, including evenings and weekends, so an order placed on Saturday at 9 pm can be changed until Sunday at 9 pm. Your email needs to reach us inside that time. Our replies follow our usual support hours, but a request sent inside the window counts as on time even if our answer comes on the next business day.</p>\n<h2>2. How to cancel or change your order</h2>\n<ol>\n<li>Open a new email to <a href=\"mailto:support@ghouly.shop?subject=Order%20change\">support@ghouly.shop</a> from the address you used at checkout if you can.</li>\n<li>Write a subject line that says exactly what you need, for example &#8220;Order #1234 — cancel&#8221; or &#8220;Order #1234 — name spelling on mug&#8221;.</li>\n<li>In the message, give the order number, the full name on the order and the change in plain words: the item, what it says now and what it should say.</li>\n<li>Send it within 24 hours of placing the order.</li>\n<li>Wait for our confirmation email. Your change or cancellation is settled once we have confirmed it in writing.</li>\n</ol>\n<p>If you place two orders by accident, one email covering both order numbers is enough. Tell us which one should stay.</p>\n<h2>3. What you can change</h2>\n<table class=\"policy-table\">\n<caption>Changes Ghouly can make within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to tell us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Size</td>\n<td>Hollow Eyes Midnight Ghost Tee from M to XL</td>\n<td>The item and the new size</td>\n</tr>\n<tr>\n<td>Colour</td>\n<td>A crewneck from Sand to Black, where the product offers both</td>\n<td>The item and the new colour</td>\n</tr>\n<tr>\n<td>Spelling</td>\n<td>&#8220;MAISIE&#8221; instead of &#8220;MAISY&#8221; on the Spooky Mama crewneck</td>\n<td>The exact text, letter by letter</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>A new apartment number or a different street</td>\n<td>The full corrected address</td>\n</tr>\n</tbody>\n</table>\n<h3>Size changes and add-ons</h3>\n<p>Adult apparel comes in S to 5XL. Sizes 2XL–3XL carry a $2 add-on and 4XL–5XL a $4 add-on over the S–XL price. If a size change moves your item into or out of an add-on band, we tell you the difference in our reply before anything is changed, and we only go ahead once you have agreed. The <a href=\"/size-guide/\">Size Guide</a> explains how to compare with a garment you already own, which is worth doing before you email.</p>\n<h3>Personalisation spelling</h3>\n<p>We print exactly what you type, in capitals, so a spelling correction is the most common change we see. Spell the corrected text out in your email exactly as it should appear, including spaces and hyphens. For the Spooky Mama Crewneck with Kids&#8217; Names, tell us the title too: Spooky Mama, Spooky Mom, Spooky Nana or Spooky Auntie. The names line holds up to 40 characters. The Ghost With Your Name Coffee Mug holds one name of up to 12 characters, and the Your Name Ghost Throw Blanket holds a name of up to 12 characters plus an optional small line of up to 22 characters. A correction has to fit those limits.</p>\n<h3>Shipping address</h3>\n<p>Give the full corrected address in one block, including the unit number, ZIP or postal code and country. We ship to the United States, Canada, Australia and New Zealand, so a new address needs to be in one of those four countries. Shipping stays free whichever of them you choose.</p>\n<h3>Adding or swapping items</h3>\n<p>If you want an extra item or a completely different design, the quickest route is a new order, which ships free. If you want to swap a product for a different one, cancel the original item within the window and place a new order for the replacement.</p>\n<h2>4. Refunds for cancelled orders</h2>\n<p>When we confirm your cancellation, we refund what you paid for the cancelled order or the cancelled items. <strong>Refunds for cancelled orders are sent within 7 days</strong>, to your original payment method, or as Ghouly store credit if you ask for that. Store credit never expires. There is no cancellation fee.</p>\n<p>Once the refund has left us, your bank or payment provider decides how quickly it appears on your statement. If you have our refund email but cannot see the money after a reasonable wait, write to us with your order number and we will share the refund details so you can ask your bank. The <a href=\"/refund-policy/\">Refund Policy</a> covers refund methods and timing in more detail.</p>\n<h2>5. After the 24 hours</h2>\n<p>If the window has passed, email us anyway and tell us what you need. We will reply within 24 hours on business days and let you know what is still possible for your order. We cannot promise a change after the window, because by then your order may already be in production or on its way.</p>\n<p>Even when a change is no longer possible, you are covered. Every Ghouly product, personalised items included, can be returned within 60 days of delivery for any reason, and we send you a free return label. You can then order the right size, colour or spelling with free shipping. The steps are on our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> page.</p>\n<h3>If the parcel has already left</h3>\n<p>We cannot cancel a parcel that is already with the carrier. If the address is wrong, email us straight away; any redirect depends on what the carrier allows. If the order reaches you and is not what you need, start a return within 60 days. Our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page explains dispatch emails and tracking.</p>\n<h2>6. A one-minute check before you order</h2>\n<p>The easiest change is the one you never need to make. Before you press the button in your treat bag, run through this short list:</p>\n<ul>\n<li><strong>The live preview:</strong> on personalised items, read the text on the product picture slowly. Capital letters can hide a doubled or missing letter, so count the letters in each name.</li>\n<li><strong>The title on the Spooky Mama crewneck:</strong> check that the select shows the right one of Spooky Mama, Spooky Mom, Spooky Nana or Spooky Auntie.</li>\n<li><strong>The size:</strong> adult sizes S to 5XL, youth sizes Youth XS to Youth XL, toddler 2T to 5T and baby Newborn to 24M look similar in a drop-down. Confirm the run you picked matches the person.</li>\n<li><strong>The colour:</strong> the colour swatch you selected is the one we print on, so compare it with the product picture once more.</li>\n<li><strong>The spook level:</strong> if you are buying for an office or a grandma, check the design&#8217;s spook level on the product page. Cute, Creepy-cute and Creepy are our own way of describing how spooky a design looks, not an official scale, and the <a href=\"/#spook-dial\">Spook Dial</a> on the homepage shows the difference.</li>\n<li><strong>The address:</strong> name, street, unit, city, region, postal code and country.</li>\n<li><strong>The email:</strong> a typo in your email address means our confirmation, dispatch and refund emails go nowhere.</li>\n</ul>\n<h3>Changes we do not handle by email</h3>\n<p>We never ask for card numbers, bank details or passwords to change or cancel an order, and you should never send them. Personalisation text that uses brands, logos, team names or film or TV characters cannot be added through a change request either, for the reasons in the next section.</p>\n<h2>7. When Ghouly cancels an order</h2>\n<p>Ghouly sells original designs only. We do not print film, TV, cartoon or game characters, brand names, logos or team names. If the personalisation text on an order uses any of these, we refuse that text and cancel the order or the affected item. We email you to explain, and the refund for the cancelled order is sent within 7 days. You are welcome to order again with different text, such as a family name or a nickname.</p>\n<p>If we have to cancel an order for any other reason, we tell you by email, explain why and send the refund for the cancelled order within 7 days. Our <a href=\"/terms-of-service/\">Terms of Service</a> and <a href=\"/intellectual-property-policy/\">Intellectual Property Policy</a> set out the rules on personalisation text.</p>\n<h2>8. A few scenarios</h2>\n<h3>&#8220;I ordered the wrong mug size.&#8221;</h3>\n<p>The Ghost With Your Name mug and the Thirteenth Morning mug come in 11 oz or 15 oz, with the 15 oz costing $3 more. Email us within 24 hours with the size you want, and we explain any price difference before we change it.</p>\n<h3>&#8220;The baby arrived early and the bodysuit size is wrong.&#8221;</h3>\n<p>Congratulations on the first spooky season. Baby bodysuits come in Newborn, 6M, 12M, 18M and 24M. Within 24 hours we can change the size. After that, return it within 60 days of delivery and order the size you need.</p>\n<h3>&#8220;I want to cancel the whole order.&#8221;</h3>\n<p>Email &#8220;Order #1234 — cancel&#8221; within 24 hours. Once we confirm, the refund is sent within 7 days.</p>\n<h3>&#8220;I only noticed the typo when the mug arrived.&#8221;</h3>\n<p>Because we print exactly what was typed, the mug will show the spelling from the order. Personalised items are still covered by our 60-day returns, with a free return label, so email us and we will set that up. Next time, the live preview on the product page is your best friend: read it slowly, letter by letter.</p>\n<h3>&#8220;I typed the wrong email address at checkout.&#8221;</h3>\n<p>Write to us from your correct address with the order number and the full name on the order. Once we can match the order to you, we can confirm the change or cancellation as usual, as long as you are within the 24 hours.</p>\n<h2>9. Contact us</h2>\n<p>For any order you have just placed, email <a href=\"mailto:support@ghouly.shop\">support@ghouly.shop</a> with your order number and the change you need. We reply within 24 hours on business days. You can see your order status in <a href=\"/my-account/\">My Account</a> under Orders, and the <a href=\"/help-center/\">Help Center</a> collects our other guides. Ghouly, 1990 Hancock Lane, Nashville, GA 31639, US.</p>\n","visible_characters":10222,"meta_description":"Email us within 24 hours of ordering to cancel or change size, colour, name spelling or address. Refunds for cancelled Ghouly orders are sent within 7 days.","parent":null,"published_at":"2026-11-17T04:06:26+00:00","updated_at":"2026-11-17T04:06:26+00:00"}}